KELEMANTAN DENGAN TIPE T-GIRDER BERDASARKAN SNI 1725-2016

Zulfani S(1*), Alamsyah Alamsyah(2), Indriyani Puhululawa(3)

(1) Politeknik Negeri Bengkalis
(2) Politeknik Negeri Bengkalis
(3) Politeknik Negeri Bengkalis
(*) Corresponding Author

Abstract


Bridge road river two Kelemantan with a length of 24 m and a width of 5.14 m. connects the village of Kelemantan to Sungai Dua Village, Kelemantan, Bengkalis sub-district. That this bridge was built several years ago may still use the old SNI imposition. Over time, the loading standard for RSNI T02-2005 bridges has been updated to become SNI 1725:2016. For the planning of the bridge in Sungai Dua Kelemetan Village, this has referred to SNI 1725-2016 concerning loading for bridges and SNI T-12-2004 regarding planning of concrete structures for bridges. Based on the planning results obtained negative and positive reinforcement slab D16-100 mm and reinforcement for D13-100 mm. For curb reinforcement D16-200 mm and longitudinal reinforcement D13-200 mm. The girder beam reinforcement for bending reinforcement is obtained 18D32 mm and 5D32 compression reinforcement. Meanwhile, the shear reinforcement is Ø13-100 mm and the web reinforcement is 8Ø13 mm. Reinforcement for diaphragm beams using 3D16 mm and shear reinforcement obtained Ø13-150 mm and shrinkage reinforcement obtained 2Ø13 mm. For longitudinal and transverse reinforcement plates obtained D16-200 mm. Calculation of reinforcement by Barbending Schedule with the need for plain U 24 steel of 3278.81 Kg and U 32 uilr of 21518.80 Kg. Implementation of this bridge requires a fee of Rp. 1.304.840.000,00

Keywords


Reinforced Concrete Structure, Bending Schedule (BBS), SNI 1725-2016

Article metrics

Abstract views : 23 | views : 0

Full Text:

PDF

References


A. Muhamad R and I. Puluhulawa, “Desain Jembatan T-Girder Pada Sungai Jalan Antara Menggunakan Sni 1725 2016,” J. TeKLA, vol. 1, no. 1, p. 27, 2019, doi: 10.35314/tekla.v1i1.1226.

S. N. R. INDONESIA, “Undang undang no 34 tahun 2004 tentang TNI,” no. 1, pp. 1–42, 2004, [Online]. Available: http://www.dpr.go.id/dokblog/dokumen/F_20150616_4760.PDF

Y. D. Setiyarto, “Standar Pembebanan Pada Jembatan Menurut SNI 1725 2016,” Load. Stand. Bridg. Accord. to SNI 1725 2016, no. 9, p. 8, 2017, [Online]. Available: https://repository.unikom.ac.id/54571/1/vii-10-y.djoko-setiyarto-standar-pembebanan-pada-jembatan.pdf

Badan Standardisasi Nasional, “Perencanaan Struktur Beton Untuk Jembatan,” pp. 1–140, 2005.

L. Hasyyati and H. Widyastuti, “Studi Kelayakan pembangunan Fly Over Jalan Akses Pelabuhan Teluk Lamong Ditinjau Dari Segi Lalu Lintas Dan Ekonomi Jalan Raya,” J. Tek. ITS, vol. 4, no. 1, p. 132, 2015.

I. P. Al Ikhsan, Juli Ardita Pribadi, “Desain Jembatan Sungai Meskom Menggunakan Girder Prategang,” vol. 1, no. 1, 2019.

I. Puluhulawa, N. Aspaliza, and A. Armada, “Perencanaan Struktur Atas Jembatan Komposit Sungai Nipah Desa Darul Aman Kecamatan Rupat,” J. Gradasi Tek. Sipil, vol. 2, no. 2, pp. 1–9, 2018, doi: 10.31961/gradasi.v2i2.588.

J. Mayendra, Alamsyah, and J. A. Pribadi, “Evaluasi dan Desain Ulang Jembatan Beton Bertulang T-Girder Menggunakan SNI 1725-2016 (Studi Kasus: Jembatan Tj.Kapal-Batu Panjang Kec.Rupat),” Semin. Nas. Ind. dan Teknol., vol. 8, pp. 293–328, 2018.

I. P. Fahrul Ahmadi, “Desain Jembatan Jalan Datuk Laksamana Dengan T-Girder

menggunakan SNI 1725-2016,” vol. 2, no. 2, 2020.

I. P. Ardi Muhamad R, “Desain Jembatan T-Girder Pada Sungai Jalan Antara Menggunakan Sni 1725 2016,” vol. 1, no. 1, 2019.




DOI: https://doi.org/10.35314/tekla.v5i2.3493

Copyright (c) 2024 Zulfani S, Alamsyah Alamsyah, Alamsyah Alamsyah, Indriyani Puhululawa, Indriyani Puhululawa


This Journal has been listed and indexed in :

 
View My Stats Creative Commons License
inovtek polbeng by http://ejournal.polbeng.ac.id/index.php/tekla is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License .