ANALISIS BIAYA PERAWATAN DAN PEMELIHARAAN JALAN PERKERASAN LENTUR DI KABUPATEN BENGKALIS
Abstract
Along with the increasing population in Bengkalis Regency, especially on Jalan Pambang Teluk Lancar. Therefore, safe, comfortable and efficient road conditions are needed to support the economic needs of the community. So a good pavement condition is needed so as not to disturb the comfort of road users. The method used in calculating maintenance over the life of the plan, which is 10 (ten) years in the future, is Life Cycle Cost. Life Cycle Cost is a method used to obtain alternatives to various possibilities in decision making and describe the present and future value of a road construction development, namely by calculating and considering inflation and interest rates. The initial construction cost or initial cost incurred is Rp 2,440,000,000.00. Routine maintenance costs amounted to Rp13,816,000 and periodic maintenance costs amounted to Rp380,817,000 which have been validated by road maintenance and road maintenance experts. The maintenance cost of the LCC is Rp1,180,613,953.72. The total life cycle cost of LCC is Rp3,620,613,953.72. At the lowest bank interest rate NPV calculation (3.5%), the NPV is Rp2,886,093,243.78. At the average bank interest rate (4.5%), the NPV is Rp 2,935,225,326.60. Meanwhile, at the highest bank interest rate (5.6%), the NPV reached Rp3,040,275,561.42.
Keywords
Full Text:
PDFReferences
Rayendra. (2019). Analisis Alternatif Pemilihan Biaya Siklus Hidup Pada Masa Pemeliharaan Ruas Jalan Janti – Prambanan Km 7+759-8+750. Teknisia, XXIV(1),25–36. https://doi.org/10.20885/teknisia.vol24.iss1.art3
Bengkalis, P. N. (2022). Tugas akhir analisis life cycle cost (lcc) pada pembangunan gedung rusunawa, politeknik negeri bengkalis. Lcc.
Menteri Pekerjaan Umum. (2011). Tata Cara Pemeliharaan dan Penilikan Jalan. Peraturan Menteri Pekerjaan Umum Nomor : 13 /Prt/M/2011 Tentang Tata Cara Pemeliharaan Dan Penilikan Jalan, 1–28
Puji Guntur Aditya, T., & Syaiful Amal, A. (2022). Perbandingan Biaya Siklus Hidup Berdasarkan Jenis Perkerasan Pada Ruas Jalan Kabupaten Kediri. Seminar Keinsinyuran Program Studi Program Profesi Insinyur, 2(1), 19–25. https://doi.org/10.22219/skpsppi.v3i1.4973
Administration, F. H. (2012). Life cycle cost analysis. In Federal Highway Administration Asset Management: The State of the Art in Europe from a Life Cycle Perspective (Vol. 9789400727, Issue September). https://doi.org/10.1007/978-94-007-2724-3_6
Qamariah, Y. (2020). ANALISIS BIAYA SIKLUS HIDUP PADA PEMELIHARAAN JALAN KOTA (JALAN MT. HARYONO, BALIUK, MARABAHAN KM 0+000 SAMPAI DENGAN KM 1+000). 62, 793–802. https://synapse.koreamed.org/Synapse/Data/PDFData/1006JKAN/jkan-37-44.pdf
Abuk, G. M., & Rumbino, Y. (2020). Analisis kelayakan ekonomi menggunakan metode Net Present Value (NPV), metode Internal Rate of Return (IRR) Payback Period (PBP) pada unit Stone Crusher di CV. X Kab. Kupang Prov. NTT. Jurnal Ilmiah Teknologi FST Undana, 14(2), 68–75.
Free, P., Flow, C., & Nilai, T. (2021). Pengaruh Free Cash Flow Terhadap Nilai Perusahaan. Jurnal Riset Akuntansi Dan Bisnis, 21(1), 100–106. https://doi.org/10.30596/jrab.v21i1.6530
Amir, A., & Zakia, Z. (2018). Optimasi Biaya Pelaksanaan Konstruksi Jalan Dengan Aplikasi Rekayasa Nilai (Value Engineering). Jurnal Teknik Sipil Dan Teknologi Konstruksi, 1(1), 72–83. https://doi.org/10.35308/jts-utu.v1i1.723
Triaji, B., & Suhardi, D. (2021). Analisa Kelayakan Gedung Parkir di Jalan Pegirian Surabaya dengan Metodo Net Present Value. Seminar Keinsinyuran Program Studi Program Profesi Insinyur, 1(2), 292–298. https://doi.org/10.22219/skpsppi.v2i1.4334
DOI: https://doi.org/10.35314/tekla.v6i1.3499
Copyright (c) 2024 Fifi Mulya Putri
This Journal has been listed and indexed in :
inovtek polbeng by http://ejournal.polbeng.ac.id/index.php/tekla is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License .